TEMPORARY CONDITION OF REINFORCEMENT CAGES PRIOR TO CONCRETING – PART 1 - MANAGEMENT GUIDANCE

Temporary condition of reinforcement cages.
Prior to being encased in concrete a reinforcement
cage should be considered as an item of ‘temporary
works’. This guide seeks to highlight the risks associated
with the temporary condition of reinforcement cages;
whether the cages is constructed in-situ or prefabricated.
Consideration is given to assembling, transporting, lifting
and rotating cages into their final position. Generalised
guidance is provided on how to identify and manage the
risks; the division of responsibility; and some practical
measures to prevent problems and accidents.
STATUS OF THE PUBLICATION: Published October 2020