top of page

HK‑TWf Site Visit Recap

8 Nov 2025

On 8 Nov 2025, HK‑TWf members visited SCL Contract 11286 – Pedestrian Link Connecting Pak Tai Street and Sung Wong Toi Station.



Two smart engineering moves caught everyone’s eye:


✅ Smarter ELS design – Raising the final excavation level allowed the removal of one strut layer, saving time, cost, and complexity. 👏


✅ SPMT footbridge installation – A safety‑by‑design method that reduced lifting risks and minimised disruption to the busy neighbourhood. 👏



Beyond the technical wins, it was inspiring to connect, share knowledge, and see innovation shaping Hong Kong’s infrastructure in real time.



A special thanks to our hosts, MTRC and CRCHK‑CR15G JV, and TWF‑HK members for making the event possible, and to all participants for your enthusiastic engagement throughout the day.

© 2024 Temporary Works Forum. All rights reserved.

  • Linkedin
bottom of page